Electrical Permit Expediting

F120 Electrical
Permit Service
for NJ Electricians

We prep and submit your F120 electrical subcode applications to any NJ municipality. Flat fee. 24-hour turnaround. We handle every deficiency until your permit is issued.

Submit Your Job →
$175 flat fee

What We Handle for NJ Electricians

Service Upgrades (100A → 200A, 400A)
The most common F120 job. We prep the application, include the load calculation summary, and submit to your municipality. We also handle the parallel ESI application to PSE&G or JCPL.
EV Charger Installations
Level 2 and DC fast charger permit applications for residential and commercial. Increasingly required in NJ — we know the forms and the municipalities that are fast vs. slow.
Generator Installations
Standby generator applications including load calculations and transfer switch documentation. Required by most NJ municipalities before installation.
Panel Replacements
Like-for-like or upgraded electrical panel applications. We include all the documentation your inspector needs to see on first review.
New Construction Electrical
Full rough-in and trim electrical permit applications for new residential and commercial construction.
Electrical Renovations
Kitchen and bathroom electrical updates, basement finishing, garage conversions — any work that requires a permit under NJ UCC.

F120 + ESI: The Full Package

Most service upgrade jobs in NJ require both a municipal F120 permit AND a PSE&G or JCPL ESI (Electrical Service Installation) application before the utility will schedule their inspection. ClearPath handles both simultaneously — so you don't end up with a permit but no ESI job number.

F120 MUNICIPAL PERMIT
  • Application prep & submission
  • Submitted to your specific municipality
  • Deficiency handling included
  • Permit # delivered when issued
ESI / UTILITY APPLICATION
  • PSE&G or JCPL application prep
  • Submitted via utility portal
  • Revision handling included
  • ESI Job # tracked in your portal

$175 Per F120 Application

Flat fee. No hourly billing. Includes application prep, submission, municipal follow-up, and deficiency response until your permit is issued.

Submit Your First Job