Electrical Permit Expediting
F120 Electrical
Permit Service
for NJ Electricians
We prep and submit your F120 electrical subcode applications to any NJ municipality. Flat fee. 24-hour turnaround. We handle every deficiency until your permit is issued.
Submit Your Job →
$175 flat fee
What We Handle for NJ Electricians
⚡ Service Upgrades (100A → 200A, 400A)
The most common F120 job. We prep the application, include the load calculation summary, and submit to your municipality. We also handle the parallel ESI application to PSE&G or JCPL.
⚡ EV Charger Installations
Level 2 and DC fast charger permit applications for residential and commercial. Increasingly required in NJ — we know the forms and the municipalities that are fast vs. slow.
⚡ Generator Installations
Standby generator applications including load calculations and transfer switch documentation. Required by most NJ municipalities before installation.
⚡ Panel Replacements
Like-for-like or upgraded electrical panel applications. We include all the documentation your inspector needs to see on first review.
⚡ New Construction Electrical
Full rough-in and trim electrical permit applications for new residential and commercial construction.
⚡ Electrical Renovations
Kitchen and bathroom electrical updates, basement finishing, garage conversions — any work that requires a permit under NJ UCC.
F120 + ESI: The Full Package
Most service upgrade jobs in NJ require both a municipal F120 permit AND a PSE&G or JCPL ESI (Electrical Service Installation) application before the utility will schedule their inspection. ClearPath handles both simultaneously — so you don't end up with a permit but no ESI job number.
F120 MUNICIPAL PERMIT
- ✓Application prep & submission
- ✓Submitted to your specific municipality
- ✓Deficiency handling included
- ✓Permit # delivered when issued
ESI / UTILITY APPLICATION
- ✓PSE&G or JCPL application prep
- ✓Submitted via utility portal
- ✓Revision handling included
- ✓ESI Job # tracked in your portal
$175 Per F120 Application
Flat fee. No hourly billing. Includes application prep, submission, municipal follow-up, and deficiency response until your permit is issued.
Submit Your First Job